The table explains the messages that may appear in the Projects screens. The most common questions come right after.

Message Where Why What to do
No permission to create projects. New the profile does not have Create in Projects ask the administrator for the right (chapter 1)
Name is required / Site is required New Project required field empty fill it in and save again
Cannot delete: the project has N task(s). Delete project the project has tasks change the state to a finished one; or delete the tasks first (chapter 4)
Member already in the team. Team tab the member is already in the team —
Cannot remove a task that has subtasks. Delete task the task is the parent of others delete or move the subtasks first (chapter 6)
Ticket already linked. Link ticket the ticket is already in this task —
Member already in the task team. Task Team already in the task team —
Computed from tickets — the typed value is ignored. task form the task is a commissioning phase the % comes from the linked tickets (chapter 6)
Progress X% applied to N task(s) / N item(s) skipped: outside your scope or no permission Apply to All in the Gantt result of the bulk progress; phases and tasks outside your scope are left out —
Subtask dates are outside this parent’s range. Click Auto-Calc at the top to synchronize. warning icon in the Gantt the parent’s dates do not cover the subtasks Auto-Calc (chapter 7)
Automatic calculation — Everything was already in sync Auto-Calc nothing needed to change —
End date must be after the start date New Cost inverted period correct Start and End
No audit template found. New Audit there is no template of type Audit register one in Knowledge › Templates (chapter 9)
Signature not found. Open the H2O app, Profile menu, and register your signature. Finish audit whoever finishes has no signature register the signature and finish again
Project not found when opening the project page the project was deleted or is in a site outside your reach go back to the list; check the header site
  • I created the project and it does not appear in the technician’s app. The app only shows the projects in whose Team the person is, directly or through a group. Add them (or their group) in the Team tab and ask them to sync (chapters 5 and 11).
  • Can I copy the schedule from one project to another? No: there is no project template and no duplicate button. The tasks are created in the Tasks tab. The MS Project XML of the original project serves as a reference (chapters 3 and 4).
  • The project is over and is still “Overdue”. On the project page, “Overdue” disappears when the State is a finished one; in the list’s Overdue filter, when progress reaches 100%. When closing, do both (chapters 2 and 4).
  • I update the tasks and the project % does not change. The project is in Manual mode (the typed number counts) or From schedule mode (the elapsed time counts). For the % to follow the tasks, change the Progress mode to From tasks in Edit (chapter 3).
  • I moved a task in the Gantt and the ones depending on it did not move. H2O draws the dependencies but does not reschedule by itself: adjust the following tasks. Critical shows which ones delay the project end (chapter 7).
  • I type the date of a parent task and it changes back. The parent task is a summary: its dates follow the subtasks. Change the dates of the subtasks (chapter 6).
  • I cannot drag the % of a task in the Gantt. The task is a commissioning phase: the % comes from the tasks of the linked tickets (chapter 6). If it is not a phase, the Edit right in Projects is missing.
  • How do I link to the project the tickets the team executes? In the Tasks tab, expand the task and use Link with the ticket number. The linked tickets appear in the PDF summary and in the app’s Tickets tab (chapter 6).
  • I do not see New Task, Link or Add. These buttons need Create in Projects; Edit on a task needs Edit; removing needs Trash. Ask the administrator for the missing level (chapter 1).
  • The client does not approve daily reports. How do I end the flow at management? Turn on Daily report without client approval in Edit: management approval then closes the report as Approved from that point on (chapters 4 and 9).
  • What is the difference between Equipment and Mobilization? Equipment (web and app) are rented machines, with daily rate and checklists. Mobilization (app only) takes company assets to the project site (chapters 10 and 11).
  • I cannot delete the project. All the tasks must be removed first, starting with the subtasks. In most cases the right thing is not to delete: change the state to a finished one and the history stays (chapter 4).
  • Project states and types do not change with the screen language. They come from an environment catalog, recorded once, without translation and without a registration screen in H2O. To add or rename one, ask ATG support (chapter 3).