Manuals
Start with Getting started and follow the order: each manual explains the web and app screens, with the frequently asked questions in the last chapter.
Getting started
Section titled “Getting started”Getting started — webHow to sign in to H2O in the browser, turn on two-factor authentication, take care of your password and find your way around the screen: menu, site, profile, search, alerts, language, help and My Profile
Structure and master data
Section titled “Structure and master data”Companies and hierarchySites and sub-sites: the company tree, who sees each site, registration, site record with map, logo, documents, notes and statistics, and the sites in the app
Users, groups and profilesWho signs in to H2O and what each person can do: user registration, profile assignments by site, password and two-factor authentication, deactivation and trash, team groups and the profile permission editor
Locations and calendarsThe tree of places of each site — buildings, floors, rooms —, how to register, move and look up tickets by location, and the calendars of working days and holidays used in SLAs, Automatic Scheduling and Maintenance Plans
AssetsRegistration of the 16 asset types, installation date and capacity, criticality matrix, calibration, components and replacement forecast, metering, asset management and warranty, reservations, reliability indicators, QR code labels, spreadsheet import and use in the app
Suppliers, contacts and workforceThe companies you work with, their people and the site's job roles: registration, links, inheritance between sites and where each one appears in H2O
Operations
Section titled “Operations”Automatic SchedulingHow to generate at once the preventive maintenance tickets of a period — UPS units, generators, cooling, switchboards — from the assets, the plans with a periodicity and the working-day calendar, and how to follow up, move and delete what was generated
PMOCMaintenance, Operation and Control Plan per building (Brazilian Law 13,589/2018, MS Ordinance 3,523/1998, ANVISA RE 09/2003, NBR 16401): the building and the technical manager with the ART, the air-conditioned rooms and the equipment, the 15 default activities and your own, the automatic scheduling of the preventive tickets, the record of the executions with photos and the PDF for the inspection
LubricationLubrication plan by point: the lubricants and their link to stock, the points of each asset (one by one, by spreadsheet or suggested by AI), the task templates generated from the plan, the scheduling of tickets, execution through the checklist on the web and in the app, oil analysis, indicators and the material forecast.
Data collectorsH2O Link Coletor: the program installed on the customer network that reads the equipment (Modbus, BACnet, SNMP, MQTT, HTTP, serial and ping) and stores the readings in the asset measurements — creating the collector and generating the token, installing on Windows, linking assets and building the points by hand, with AI or from a model, discovering the network, following the health, the alerts and the automatic tickets, and updating, moving and removing
Task templates and checklistsHow to build in H2O the checklists the team answers in the field — the task templates, with the 23 question types, required photo, measurement ranges, sections and row-based reports; the AI assistant that generates the draft; where each kind of template is used (tickets, Automatic Scheduling, commissioning, audits, equipment, APR, PT and inspections); how it is executed on the web and in the app; and the non-conformities that become NCRs
Punch list (GQE)Quality Assurance in Execution and the client punch list: record the field deviation with a photo, fix it, request validation with the closing photo, validate by Quality, open the work order, escalate to NCR, the items opened by a commissioning failure, and the handover report as PDF and spreadsheet
Construction
Section titled “Construction”ProjectsHow to create and follow up a project in H2O — construction, infrastructure implementation or retrofit, maintenance shutdown —: team, tasks and Gantt, actual × expected progress, costs and estimates, daily reports, audits, equipment, materials and documents, on the web and in the app
CommissioningHow to organize the commissioning of a data center or a construction job in H2O — levels L1 to L5, test routines per asset type, test tickets generated in a batch, Approved / Failed / Retest results, assets × phases matrix, defects handled in GQE and NCR, asset dossier —, on the web and in the app
Daily reportHow to record the job's day in H2O — automatic weather, activities with photos, workforce per job role and company, equipment and energized area —, have it approved with signature by engineering, management and the client, generate the PDF and send the daily reports by e-mail, on the web and in the app
Supplies
Section titled “Supplies”Purchasing: orders, quotations and accounts payableHow to buy through H2O — prepare suppliers for quotation, ask for prices through a link the supplier answers without logging in, compare the proposals and choose the winner of each item, issue the purchase order with the ERP code, match the order against the invoice on receipt (on the web and in the app) and track the installments in accounts payable
NF-e and material receivingHow to receive the job's material in H2O — import the invoice by its access key, check item by item with photos and the reference image, attach invoice, order and certificates (with the document scanner in the app), approve with signature by engineering and the client, load the materials into the stock and generate and send the inspection PDF
Quality, safety and environment
Section titled “Quality, safety and environment”Occupational SafetyComplete manual of the SST module — H2O web and app: from worker registration to eSocial, with APR, PT, inspections, deviations, accidents, PGR, CIPA and contractor oversight
EnvironmentLicenses, legal calendar, waste (PGRS/MTR), sources and monitoring, refrigerants, chemicals, incidents, legal requirements, ISO 14001 and ESG
Energy ManagementEnergy consumption by facility, management system (Chile's Law 21.305 and Decree 28/2021, ISO 50001), indicators with a baseline, action plan, compliance, greenhouse gas inventory (GHG Protocol), public-sector buildings and reports.
Settings
Section titled “Settings”AI agentsHow to connect H2O to artificial-intelligence agents — Claude, ChatGPT, Copilot, Gemini and others that speak the MCP protocol — to look up tickets, assets and projects and, if you allow it, open tickets and record follow-ups.
Was this page helpful?
Thanks for the feedback!
Got it — we will improve this page.