Material forecast

Manual — Lubrication · chapter 11 of 12

In Reports › Material forecast H2O adds up what lubrication and the other scheduled tasks will consume and compares it with today’s stock, by site.

The Material forecast report.

Figure 17. The Material forecast report.

  1. 1The source: All, only Lubrication or only Tasks.
  2. 2The period: next 30, 60, 90, 180 or 365 days (or free dates).
  3. 3Materials short — the need exceeds the balance.
  4. 4First stock-out — the day the stock runs out if nothing is purchased.
  5. 5The list by material, with what runs short first at the top. The arrow shows the occurrences.
  6. 6PDF and Export, to take the forecast to the purchasing department.
Source What is included
Lubrication The active points of the plan, repeated by their frequency from the next due date on. An overdue point enters on the first day of the period.
Tasks The open tickets in the period whose task template has materials, and the future occurrences of the time-based Maintenance Plans.
  • Balance today is the stock of the equipment’s site.
  • Value = need × average stock cost. A material with no known cost has no value.
  • The By month, By asset and Occurrences tabs show the same forecast from other angles.
Status What it means
Short The need in the period exceeds the balance.
Below minimum It is not short, but after consumption the balance falls below the registered minimum.
Covered The balance meets the period.
No stock item A lubricant not linked to stock, or a material typed into the template: the need appears, but there is no balance to compare.