Material forecast
Manual — Lubrication · chapter 11 of 12
In Reports › Material forecast H2O adds up what lubrication and the other scheduled tasks will consume and compares it with today’s stock, by site.
Figure 17. The Material forecast report.
- 1The source: All, only Lubrication or only Tasks.
- 2The period: next 30, 60, 90, 180 or 365 days (or free dates).
- 3Materials short — the need exceeds the balance.
- 4First stock-out — the day the stock runs out if nothing is purchased.
- 5The list by material, with what runs short first at the top. The arrow shows the occurrences.
- 6PDF and Export, to take the forecast to the purchasing department.
Where the need comes from
Section titled “Where the need comes from”| Source | What is included |
|---|---|
| Lubrication | The active points of the plan, repeated by their frequency from the next due date on. An overdue point enters on the first day of the period. |
| Tasks | The open tickets in the period whose task template has materials, and the future occurrences of the time-based Maintenance Plans. |
- Balance today is the stock of the equipment’s site.
- Value = need × average stock cost. A material with no known cost has no value.
- The By month, By asset and Occurrences tabs show the same forecast from other angles.
The status of the material
Section titled “The status of the material”| Status | What it means |
|---|---|
| Short | The need in the period exceeds the balance. |
| Below minimum | It is not short, but after consumption the balance falls below the registered minimum. |
| Covered | The balance meets the period. |
| No stock item | A lubricant not linked to stock, or a material typed into the template: the need appears, but there is no balance to compare. |