Public-sector buildings

Manual — Energy Management · chapter 10 of 13

This screen is for public bodies in Chile: municipalities, regional governments and bodies of the administration. Law 21.305 requires them to report to the Ministry of Energy, within the first 40 days of each year, the record of every building the body occupies or manages and the energy consumption of the largest ones.

Private companies and bodies in other countries do not need it.

Each building is an H2O site. The consumption comes from that site’s activity data, with no retyping.

The Public-sector buildings screen.

Figure 25. The Public-sector buildings screen.

  1. 1The Reporting year and Download the report.
  2. 2The cards: buildings on file, how many report consumption, how many have complete consumption and the period of the report.
  3. 3The Buildings and Energy managers tabs.
  4. 4The building, the site and the use.
  5. 5Consumption in the report: Reports, with the reason, or Record only.
  6. 6The Record: complete or with the fields that are missing.
  7. 7Consumption for the period by source, with the months that are missing.
A building reports consumption if it Criterion
is large 500 m² built or more
is heavily occupied less than 10 m² per person
is a health building health facility or clinical laboratory

The others only have the record. A building whose meter is shared with others is Exempt from reporting consumption: tick this on the record, with the explanation.

  1. Click New building and choose the H2O site.
  2. Fill in the Identification: property number, tenure, address and coordinates.
  3. Fill in Use and construction: use, year, areas, workers and occupants.
  4. Describe the Envelope (foundations, walls, roof, doors, windows) and the Systems (lighting, ventilation, heating, cooling, hot water).
  5. Save.
The record of a building.

Figure 26. The record of a building.

  1. 1Identification.
  2. 2Use and construction.
  3. 3Envelope.
  4. 4Systems.
  5. 5Consumption: the shared-meter tick box and the explanation.

The body needs at least one public energy manager, a civil servant or public agent, who completes the Ministry’s training within six months of the designation.

  1. On the Energy managers tab, click New manager.
  2. Enter the name, identity document, position and contact.
  3. Enter the date of the Designation and, once completed, that of the Training.

The list shows the training status of each one: Trained, Within the deadline or Training overdue.