Skip to content
ATG.H2OHelp
Try the demo

SST dashboard and reports

Manual — Occupational Safety · chapter 11 of 13

The SST dashboard (Occupational Safety › SST dashboard) summarizes the period in cards and charts, with no people’s names — it is meant for the SST meeting, for the project manager and for the contract inspector.

SST dashboard with the "Month" period and all projects. Rows: field documents (APR, PT, inspections, deviations, toolbox talks); accidents (events, lost-time, lost days, FR/SR, pending CAT); PGR and risks; ASO; CIPA; corrective actions.

Figure 76. SST dashboard with the “Month” period and all projects. Rows: field documents (APR, PT, inspections, deviations, toolbox talks); accidents (events, lost-time, lost days, FR/SR, pending CAT); PGR and risks; ASO; CIPA; corrective actions.

  1. 1Project filter (All projects); on the left, the period: Month / Quarter / Year or dates.
  2. 2APRs in the period card (finished and open); on the same row, PTs, Inspections, Deviations and Toolbox talks (DDS).
  3. 3FR / SR per NBR 14280 (the Brazilian accident statistics standard), with estimated HHT (active × 176 h × months) or the value you enter.
  4. 4ASO up to date and the other ASO cards; on the next row, CIPA — counts only, names stay on their own screens.
  5. 5Corrective actions: total, resolved, overdue and handling rate.
Dashboard charts: deviations by level (pie) and by class, trend of APRs/PTs/inspections/deviations over the last 6 months and deviations by project.

Figure 77. Dashboard charts: deviations by level (pie) and by class, trend of APRs/PTs/inspections/deviations over the last 6 months and deviations by project.

  1. 1Deviations by level (pie); next to it, by class.
  2. 26-month trend.
  3. 3Deviations by project.
App SST dashboard: Month / Quarter / Year and Project filters; APR, PT, Inspection and Deviations cards (with "N critical still open"); bars of deviations by level and by class. Everything is calculated on the device, from what has been synced — it works for a field meeting without internet.

App H2OFigure 78. App SST dashboard: Month / Quarter / Year and Project filters; APR, PT, Inspection and Deviations cards (with “N critical still open”); bars of deviations by level and by class. Everything is calculated on the device, from what has been synced — it works for a field meeting without internet.

  1. 1Period (Month / Quarter / Year).
  2. 2Project; below, the APR, PT, Inspection and Deviations cards.
  3. 3Deviations by level; further down, by class.

In Overview › Reports (Reports tab, list on the left) there are four SST reports, all with Excel/PDF export and a column picker (Reports right):

Report What for Content
SST — Workforce compliance who can go into the field today per worker: ASO, training, OS, PPE, APRs, pending issues; indicators at the top
SST — Expirations plan refreshers and renewals from 30 to 365 days: ASO, training, contractor document, PPE CA, PGR (revision), CIPA (term and harassment training)
SST — Accidents & incidents statistics for the period FR/SR, pending CAT, not investigated; each row opens the event
SST — Documents & signatures integrity audit APR, PT, inspection, training and accident: finished, number of signatures, invalidated; eSocial events generated
Reports › SST — Workforce compliance (side menu, Reports tab): filters (name/CPF/employee ID, job role, status); indicators — active workers (8), no pending issues (4), ASO pending/expired (2), pending training (4), work instruction not acknowledged (0), no PPE delivered (6); and the table per worker (job role, company, status, ASO, pending training, SST work instruction, PPE, APRs, pending issues), with the export and column picker icons in the corner of the header. Footer: "No clinical data: only ASO status and validity (LGPD)".

Figure 79. Reports › SST — Workforce compliance (side menu, Reports tab): filters (name/CPF/employee ID, job role, status); indicators — active workers (8), no pending issues (4), ASO pending/expired (2), pending training (4), work instruction not acknowledged (0), no PPE delivered (6); and the table per worker (job role, company, status, ASO, pending training, SST work instruction, PPE, APRs, pending issues), with the export and column picker icons in the corner of the header. Footer: “No clinical data: only ASO status and validity (LGPD)”.

  1. 1name, CPF, employee ID filter; next to it, job role and status.
  2. 2Status column — OK or Pending per worker.
  3. 3Pending issues column — what is missing (expired/unfit ASO, training).
Reports › SST — Expirations: horizon (here, next 60 days), filter by type, cards (items within 60 days, already expired, expiring within 30 days) and the table — in the example, 4 items, all already expired (two NR-10 trainings, the contractor's PCMSO and an ASO). The report shows only what belongs to the company chosen in the header; the contractor document is included by the contract's site.

Figure 80. Reports › SST — Expirations: horizon (here, next 60 days), filter by type, cards (items within 60 days, already expired, expiring within 30 days) and the table — in the example, 4 items, all already expired (two NR-10 trainings, the contractor’s PCMSO and an ASO). The report shows only what belongs to the company chosen in the header; the contractor document is included by the contract’s site.

  1. 1Horizon (next 30 to 365 days).
  2. 2Days left column (negative = already expired).
Subject To whom When
Training expiring person in charge/RT of the training according to the validity
ASO expiring users with the ASO right (Edit) 30, 15, 7 and 0 days
PGR — revision PGR technical lead 60, 30, 7 and 0 days
CIPA — term / harassment training users with the CIPA right (Edit) term 60/30/7/0; harassment 30/7/0

SST e-mails do not include health data — only the name, the type and the date.

Was this page helpful?