Frequently asked questions and messages
Manual — PMOC · chapter 10 of 10
The table explains the messages that can appear in the PMOC. The most common questions come right after.| Message | Where | Why | What to do |
|---|---|---|---|
| PMOC is not installed in this environment (migration 2026_10_39 pending). | list and page | the company database does not have the module tables yet | ask H2O support |
| Could not load the PMOC. | list, tabs | network or server failure while reading | reload the page |
| PMOC not found. | page, buttons, tabs | the PMOC was deleted, or belongs to a site outside your scope | go back to the list; ask for access to the site (manual Companies and hierarchy, chapter 2) |
| Could not save. | Save, Create, rooms, activities | invalid field (empty name, periodicity outside 1–3650, negative area) or missing right | check the fields and the Edit right in Maintenance plans (chapter 1) |
| Site out of your scope. | changing the PMOC site (API) | the new site is not among your sites | choose a site within your scope |
| Data pulled from {name} — the user has no registration (CREA/employee ID): fill it in by hand. | Pull from a user | the user record has neither a CREA nor an employee ID | fill in Registration and Council by hand, or complete the user record (chapter 4) |
| User not found. | Pull from a user | the user was deleted between the search and the choice | search again |
| The site has no ART-type document. Attach it on the site page (Documents › ART type). | Building tab, ART (technical responsibility record) card | no ART-type document at the site nor inherited from the sites above | attach the ART on the site page, Documents tab, type ART / TRT (chapter 2) |
| No rooms registered. Register the air-conditioned rooms and link the equipment. | Rooms tab | the PMOC has no rooms | New room (chapter 5) |
| No equipment linked. | Rooms tab, room row | the room has no equipment ticked | pencil › tick the equipment |
| Nothing found. | equipment search in the room; user search | the text matches no asset/user of the site | change the search; check that the asset is HVAC and at the right site |
| Room not found. / Activity not found. | edit or remove | someone else already removed it | reload the page |
| Remove room “…”? The equipment stays in the inventory. | room trash can | confirmation | confirm or cancel |
| No HVAC asset at the site. | Equipment tab | the site (and the sites below) have no assets of the HVAC family | register the assets or create the PMOC at the right site (chapter 2) |
| {n} equipment item(s) without a room / no room | Equipment tab, PDF | inventory equipment that no room claims | put it in a room, or leave it (it enters the schedule anyway) |
| No activities. Use “Create default activities” or register your own. | Activities tab | the PMOC has no activities | Create default activities (chapter 6) |
| The effective periodicity in the schedule is the template one ({t}); the activity says {a}. Adjust the template or the activity. | Activities tab, Periodicity column | the task template periodicity differs from the one declared in the activity | edit the template or switch it (chapter 6) |
| Remove activity “…”? Its schedule items are deactivated on the next generation. | activity trash can | confirmation | confirm; then Generate schedule to deactivate the items |
| No schedule yet. Register the activities and equipment and click “Generate schedule”. | Schedule tab | the schedule has not been generated yet | Generate schedule (chapter 7) |
| No item generated yet. | Schedule tab, table | no equipment × activity pair generated | check active activities with a template and equipment that matches the “Applies to” |
| Schedule generation is not available in this environment. / Automatic Scheduling is not installed in this environment. | Schedule tab | the company does not have the Automatic Scheduling module | support |
| Some equipment has no room — it was included anyway. | Generation result › Warnings | warning: equipment without a room in the schedule | nothing required; organize the rooms if you want |
| No calendar registered: the schedule needs a calendar (Planning › Automatic Scheduling). Nothing was generated. | Generation result › Warnings | the company has no calendar | register a calendar (chapter 2) and generate again |
| PMOC without a validity end date: the schedule runs 12 months from the start. | Generation result › Warnings | the End of the validity was empty | fill in the validity; the schedule already generated can have its horizon adjusted on its page |
| Nothing to generate: no active activity with a template applies to the site equipment. | Generation result › Warnings | no valid pair: inactive activities, no template, room-only, or an “Applies to” that does not match | check the Activities tab (chapter 6) and the inventory |
| Could not move the planned tickets of a deactivated item to the trash. | Generation result › Warnings | the item was deactivated, but some planned ticket remained | cancel it on the schedule page |
| room activity / no task template / “applies to” does not match | Generation result › skipped | the reason for each skipped pair | expected for A11; in the others, give the activity a template or adjust the “Applies to” |
| Activate this PMOC? If the site already has an active PMOC, it will be archived and its schedule closed (end date = today; nothing is deleted). | Activate PMOC | confirmation | confirm (chapter 7) |
| Archive this PMOC? Its schedule will be closed (end date = today; tickets already generated remain). | Archive | confirmation | confirm |
| Delete this PMOC? Rooms, activities and links stop showing; the schedule and tickets remain. | Delete | confirmation; the schedule is not closed | archive first if the schedule must stop |
| No tickets in the period. | Execution tab | no ticket of the schedule with a due date in the period | widen the period or generate the schedule |
| Could not generate the PDF. | PMOC PDF | server failure while building the document | try again; if it persists, support |
| No PMOC registered. | list | no PMOC at the sites you see (or the filter found nothing) | New PMOC, or clear the filters |
Frequently asked questions
Section titled “Frequently asked questions”- I cannot find the PMOC menu. It is in Operations › PMOC and appears for whoever has Read on the Tickets row (Operations group) or on Maintenance plans (Planning group). To act — create, save, activate, generate — you need Create/Edit in Maintenance plans (chapter 1).
- Can I build the PMOC in the app? No. The PMOC is built on the web. What goes to the app is the preventive ticket, executed like any other (chapter 8).
- Do I need one PMOC per building? Yes: one PMOC per site, and only one active per site. If the company has several buildings, each one is a site with its own PMOC. If a site groups several buildings, the equipment of all of them enters the same inventory — separate them by rooms (chapter 5) or create one site per building.
- The equipment does not appear on the Equipment tab. Only assets of the HVAC family whose site is the PMOC site or a site below it enter. Check the family and the site on the asset page (chapter 2).
- The activity periodicity says 30 days, but the tickets come out every 90. The schedule follows the periodicity of the task template, not of the activity. The Periodicity column warns in amber when they differ: edit the template or switch it and generate again (chapter 6).
- A11 (air quality) generated no ticket. It is a room activity (“Applies to” = ambientes): it stays in the plan and in the PDF, but does not generate per equipment — the measurement is done by a laboratory. If you want a six-monthly reminder, create an activity with an empty “Applies to” (chapter 6).
- I clicked Generate schedule twice. Did it duplicate? No. The second generation reuses the schedule and only adds what is missing; the result shows already existed (chapter 7).
- I added a new split unit. How does it get in? Register the asset at the site, put it in a room (optional) and click Generate schedule: its pairs appear as new and the tickets are generated from today to the end of the horizon (chapter 7).
- I changed the validity and the schedule keeps the old horizon. The horizon is set on the first generation and does not follow the validity. Adjust the dates on the schedule page (Automatic Scheduling manual, chapter 6) or archive and create a new PMOC for the new validity (chapter 7).
- I activated the 2027 PMOC and the 2026 tickets disappeared? No: the 2026 PMOC was archived and its schedule closed (end = today, Finished). The tickets already generated stay on the agenda; cancel on the schedule page the ones that should no longer happen (chapter 7).
- The technician is empty on the Execution tab and in the PDF. H2O shows the technician of the ticket’s task, or the technician assigned to the ticket. Assign the technician (or set a default technician in the template) so that the name comes out (chapter 8).
- The ticket photos do not count as evidence. Only the photos of the task’s checklist items and the ticket attachments count. In the cleanings the template already asks for before and after; in the other activities, add an item with a required photo to the template (chapters 6 and 8).
- I want the PDF for September only. The screen generates the PDF of the whole period; the date range of the Execution tab applies only to the screen. The PDF address accepts the dates — ask support, or use the filtered Execution tab for the check (chapter 9).
- I deleted the PMOC and the tickets keep being generated. Deleting does not close the schedule. Close it on the schedule page (Planning › Automatic Scheduling) — or, next time, Archive before deleting (chapter 7).
Was this page helpful?
Thanks for the feedback!
Got it — we will improve this page.