Skip to content
ATG.H2OHelp
Try the demo

Revalidate a PT in the app

A PT that lasts several days is revalidated every day, in the app itself, with the same roles signing.

  1. Open the PT. In the Revalidations section, tap New revalidation.
  2. Enter the Date, the Start time and the End time, answer Were the permit conditions maintained? and, if needed, the Notes. Tap Confirm.
  3. Collect the signatures: each revalidation shows the four role badges (✓ = signed). Tapping a pending role opens the signature pad.
  4. At the end of the day, tap Finish PT and answer Service completed, Area cleaned and Keep the permit open for daily revalidation?. With Yes, the day’s closing is recorded and the PT stays open.
PT detail with Work crew and Revalidations
The PT with the Revalidations section.
New revalidation: date, times, conditions, notes
New revalidation.
Finish PT: service completed, area cleaned and keep open
Finish PT.

See also: APR, PT, inspection and deviation in the manual.

Was this page helpful?