Contractor SST oversight
Manual — Occupational Safety · chapter 9 of 13
In public contracts (and in any contract where the company is the client), the contract inspector must prove that the contractor meets its SST obligations: PGR and PCMSO valid, workers with ASO, training and PPE, and recorded periodic oversight (Law 14.133 — the Brazilian public procurement law — art. 117/121; IN SEGES 05/2017, Annex VIII-B). The Occupational Safety › Contractor SST oversight page does this by contract and by month, reading the data already in the module, and locks the approval of the measurement when there is a pending issue without justification.
Figure 69. List of contracts under oversight: legal text with the scope (here “all contracts”; for an inspector, deputy or manager the scope is “contracts where you are inspector, deputy or manager”); columns Contract, Client, Workforce (without pending issues / total), Docs, Pending issues and Last oversight. In the example, CT-2026/024 (Elevator maintenance — Tower A, this company) is set up: 0 / 2, 2 docs, 4 pending issues, oversight on 08/10/2026 (the list also shows the other demo contracts set up the same way, CT-2026/034 and CT-2026/014); the others show 0 / 0, 3 pending issues and “never”.
- 1Legal basis (Law 14.133 art. 117 and 121 §3; IN SEGES 05/2017 Annex VIII-B) and the scope of the list.
- 2Workforce: workers without pending issues / total.
- 3Docs: contractor documents on file.
- 4Month’s Pending issues (red); next to it, the date of the last oversight.
| Contract tab | What it shows | What you do |
|---|---|---|
| Summary and pending issues | cards (pending issues, workforce ok, documents, active PGR, accidents without CAT), list of pending issues, Environment block (licenses and conditions), contractor PGR and CIPA | read and decide what to demand |
| Allocated workforce | each worker on the contract with ASO, training, SST work instruction, PPE, last APR and pending issues; suggestions of people who appeared in APRs/PTs of the projects in the last 120 days | Add / Record exit |
| Contractor documents | PGR, PCMSO, LTCAT, CIPA, SESMT/technical lead, ART, Insurance, Other — with issue date and validity | Record document (an expired one becomes a pending issue) |
| Oversight (Annex VIII-B) | Initial / Monthly / Sample-based checklist, item by item OK / Pending / N/A; history | Record (a pending issue requires a justification / action) |
Setting up the workforce and the documents
Section titled “Setting up the workforce and the documents”
Figure 70. Contract CT-2026/024 — Elevator maintenance — Tower A, month 10/2026: cards Pending issues (4), Workforce without pending issues (0 / 2), Documents (2), Active PGR (PGR-2026-0004) and Accidents in the period (1); PDF report button. Allocated workforce tab: each worker with Job role / company, ASO, Training, SST OS, PPE, Last APR and named Pending issues; the × at the end of the row records the exit. Below, the suggestions of people who appeared in APRs/PTs of the contract’s projects.
- 1Contractor worker (Luke Bennett, since 08/09/2026) with an expired ASO and pending training — this becomes a named pending issue.
- 2Add a worker to the workforce.
- 3Suggestions: appeared in APRs/PTs of the contract’s projects (120 days) and are not on the list — add link next to each name.

Figure 71. Contractor documents tab: columns Type, Document, Issue date, Valid until and Status, with view and delete icons. In the example, the PCMSO (NR-07) is expired (09/08/2026, in red) and the PGR (NR-01) is ok until 02/12/2027.
- 1Record document.
- 2Rule shown: PGR and PCMSO are required (initial oversight); LTCAT, CIPA, SESMT/ART and insurance according to the contract; an expired document becomes a pending issue.
- Open the contract and, in Allocated workforce, add the contractor’s workers (or accept the suggestions).
- In Contractor documents, record the PGR and PCMSO (and any others required by the tender) with their validity.
- Go back to the Summary: the pending issues appear by name (so-and-so’s expired ASO, expired PCMSO, accident without CAT…).
Recording the oversight
Section titled “Recording the oversight”
Figure 72. Oversight (Annex VIII-B) tab: “Record oversight — 10/2026” with the type (Monthly; also Initial and Sample-based), six items with their legal basis and OK / Pending / N/A buttons, the line “Automatic pending issues in the period: 4 · items marked pending: 0”, the Justification / action required from the contractor (required), Notes and Record. Below, the History (10/2026 · initial, 5 pending issue(s), justification) with the gov.br / ICP-Brasil external signature block.
- 1Oversight type (Monthly).
- 2Marking for each item: OK / Pending / N/A.
- 3Justification / action required from the contractor (kept in the trail) — required when there is a pending issue.
- 4Record; the history below keeps each oversight and accepts the file signed on gov.br.
The measurement gate
Section titled “The measurement gate”In Finance › Contract Measurements, when you approve the measurement of a contract that has an SST setup (workforce, documents or oversight already on file), the system checks the month’s summary. If there is a pending issue, the approval is refused with sst_pending and the modal shows the SST panel; the inspector can approve with a justification (sst_override_reason), which stays in the measurement trail. A contract without an SST setup is not affected.
The contract PDF report (button on the detail, by month) brings together workforce, documents, oversight records and pending issues — it is the evidence for the oversight process. For public contracts, sign the PDF on gov.br and attach it to the trail (chapter 10).