An energy performance indicator answers a simple question: this month, did we use more or less energy than we should have? The “should have” is the baseline: how much we were expected to use, given the month’s conditions.Creating the indicator
Section titled “Creating the indicator”- On the Indicators tab, click New indicator.
- Choose the Facility and give it a name.
- Say where the energy comes from: from an energy carrier (the consumption in the activity data) or from a meter.
- Enter the Acceptable range, in % above or below the expected value.
- Tick Open a ticket when the month closes above the range if you want H2O to open a ticket when the month leaves the range.

Figure 14. The Indicators tab.
- 1New indicator.
- 2The indicator and the facility.
- 3The Baseline in use, with the version and the R².
- 4The Acceptable range and the Last evaluation, in red when it left the range.
- 5Open shows the baseline, the chart and the evaluations.
The baseline
Section titled “The baseline”The baseline is calculated from a base period, usually the twelve months of the previous year. There are two models.
| Model | When to use it | How it calculates |
|---|---|---|
| Period average | the consumption does not depend on anything that varies | the expected value is the average of the base months |
| Regression with variables | the consumption follows production, weather or occupancy | fits a line between the consumption and up to two variables |
- Open the indicator and, under Calculate the baseline, choose the Base period.
- Choose the Model and, for the regression, the variables.
- Click Calculate. H2O shows the equation, the R² and the number of points.
- If the fit is good, click Save version and, in the list of versions, Approve and use.

Figure 15. The indicator opened.
- 1The Baseline in use: period, model, equation and R².
- 2The chart: the Actual consumption against the one Expected by the baseline, with the acceptable range.
- 3The table month by month, with the Deviation and whether it stayed in range.
- 4A month Out of range, with the ticket opened, Evaluate and the button to record the Cause analysis.
Only the approved baseline applies. When the operation changes (a new piece of equipment, an extra shift), calculate a new version; the previous one is kept.
The monthly evaluation
Section titled “The monthly evaluation”Every month, once the month’s consumption and variables are entered, H2O compares the actual with the expected. This happens by itself, overnight, and also with the indicator’s Evaluate button.
| Result | What happens |
|---|---|
| Within the range | the month is recorded as In range |
| Above the range | the month is Out of range and, if the indicator opens tickets, a ticket is created for the system’s group |
| Previous month’s ticket still open | the new deviation goes in as a follow-up on the same ticket |
Record the analysis of the deviation on the month’s own row: the regulation requires deviations to be analysed, and this note goes into the annual report.