Message Where Why What to do
Select a project New Daily Report in the general list the project is missing choose the Project
Daily report created New Daily Report result —
Error creating daily report / You do not have permission for this action New Daily Report Create in Projects is missing on the project’s site ask the administrator for the right (chapter 1)
Daily report updated / Error saving Edit Information result / Edit in Projects is missing —
Uploading N of M… Add media the files being uploaded wait; Cancel stops after the current file
N added, N failed / No media was added Add media some file did not go up (connection, size, right) try again only with the missing ones
No roles configured Workforce tab the job’s site and those above have no job roles register them in People › Workforce (chapter 4)
This will replace the entire current workforce. Continue? Copy Workforce confirmation OK to replace the whole workforce
Minimum quantity: 1 Equipment tab zero or negative quantity enter 1 or more
Awaiting Engineering approval — you do not have this permission daily report page the step belongs to another role (Engineering, Management or Client) —
State → … daily report page the flow moved on —
Register your digital signature before approving daily reports. approve no signature in the record register it in My Profile (chapter 5)
You are not allowed to approve as … / … to reject as … approve / reject the profile does not have the mark of that step ask for Approve (Eng.), Approve (Mgmt.) or Approve (Client)
You do not have permission for this action submit, approve, reject, archive, reopen Edit in Daily Reports is missing ask for the right
Management can only approve after Engineering. / The Client cannot approve directly: … approve the previous step was not approved — usually, the screen was out of date reload the page
This daily report cannot be approved in its current state. / … rejected in its current state. approve / reject someone already changed the state reload the page
Error recording the signature on the daily report. The approval was not completed. Contact the administrator. approve the signature file was not found on the server register the signature again in My Profile and try; if it persists, call support
Error generating PDF: … PDF icon generation failure (many media files, corrupted file) try again; if it persists, call support
Enter at least one valid e-mail. Send by e-mail no e-mail recognized check the addresses
ZIP package with N daily reports queued! … Send by e-mail result wait for the e-mail
Daily reports outside the sites you can see, or not found: … Send by e-mail some checked daily report is on a site outside your reach or was deleted reload the tab and check them again
Delete this daily report? → Daily report removed trash can on the page confirmation / result —
Daily report not found daily report page the daily report was deleted or is outside your reach go back to the list
The daily cannot be for a future date. app, New daily report date after today choose today or a past date
No previous days to copy app, Copy from a day the job has no other daily report create it blank
Write the activity before adding. / Enter the equipment. / The quantity must be greater than zero. app empty field or zero fill it in
Daily report saved — goes up on the next sync. / Photo saved in the daily report. app saved on the device synchronize when you have signal
State updated — uploads on next send app, approval the step was saved on the device synchronize for the web to see it
No action for you on this daily report right now. app, Approval the step belongs to another role —
No team configuration for this site app, workforce no job roles on the device synchronize; if it continues, register the job roles
No work site on the device. Sync from the home screen. app, Daily report you are not on the team of any project, or the app has not synchronized synchronize; ask to join the project team
This day’s report will be deleted. Confirm? app, Delete daily report confirmation confirm
  • I created two daily reports for the same day. What now? The web does not prevent it. Keep one and delete the other (trash can on the page, with Trash in Projects). In the app this does not happen: the daily report of a date is only one (chapter 3).
  • The daily report came out without weather. The project’s site had neither coordinates nor city when the daily report was created. Fix the site record; opening the daily report in the app online fetches the weather for the date, and the H2O administrator can fill in the old daily reports (chapter 3).
  • The approve button does not appear. Either it is not your step (the notice says whose turn it is), or the mark is missing from the profile: Approve (Eng.), Approve (Mgmt.) or Approve (Client), together with Edit in Daily Reports (chapter 1).
  • I clicked Approve and Register Signature opened. That is expected on the first approval: sign and save, and the approval continues by itself. The signature stays in your profile for the next ones (chapter 5).
  • I changed my signature. Do the daily reports already approved change? No. Each daily report keeps a copy of the signature from the moment of approval.
  • The client does not approve daily reports. How do I close them at management? Turn on Daily report without client approval in the project. From then on, Approve (Final) takes the daily report to Approved. The daily reports that were already Awaiting Client keep waiting (chapter 5).
  • Where is the reason for the rejection? In Client observations, on the Information tab and in the PDF. When correcting the daily report, adjust that field before resubmitting (chapter 5).
  • I copied yesterday’s daily report and its observations came along. The copy always brings the observations, the energized area and the team comments; the marks only choose activities, media, workforce and equipment. Review the Information tab of the new daily report (chapter 3).
  • A contractor does not appear in the Workforce. Add it to the project Team as a supplier; it becomes a row of the grid (chapter 4).
  • The PDF came out in another language. The PDF comes out in the language of whoever generates it; when sent by e-mail, in the language of whoever requested the sending. Typed text comes out as it was saved; the weather condition comes out translated (chapters 3 and 6).
  • The list does not show ⚡ Yes and the PDF does not show the energized area. The Yes answer is missing: in Edit Information, select Yes in Energized area?, or turn on the Energized site? switch in the app (chapters 4 and 8).
  • The general list search does not find a daily report by its observations. The general list search looks for project, author, daily report name, date and number. To search the observations, use the search of the project’s Daily Reports tab (chapter 2).
  • I sent it by e-mail and it did not arrive. The ZIP is built in the background: wait a few minutes and check the spam folder. The link is valid for 30 days (chapter 6).
  • I need to correct a daily report already approved. Use Reopen: it returns to In progress and goes through the approvals again. Each change made on the web goes into the History (chapters 5 and 7).
  • The technician creates and sends the daily report through the app, but does not see the buttons on the web. In the app, creating and sending require only Read in Daily Reports; on the web, creating requires Create in Projects and submitting requires Edit in Daily Reports (chapter 1).
  • In the app, a daily report appears with the Rejected badge. It was rejected by an old version of the app. The reason appears on the card; the daily report follows the In progress path: correct it and send it again. On the web it appears as In progress, with Reopen (chapters 5 and 8).

Was this page helpful?