Flow 3 — APR, PT, inspection and deviation
Manual — Occupational Safety · chapter 5 of 13
This is the heart of the module and what the field team uses every day. The three documents — APR (Preliminary Risk Analysis), PT (Work Permit) and Safety inspection — work the same way: they are created from a template (with the checklist), on a project, get responsible persons and a team, have the checklist answered (with photos), are signed and finished. The PT depends on the APR; the inspection produces deviations; the deviation produces corrective actions.| Document | Who signs | To finish | Produces |
|---|---|---|---|
| APR | responsible persons (users, registered signature) + team acknowledgment (workers, drawn signature) | responsible persons and team signed, checklist with no pending items | basis for the PT; risk grid |
| PT | issuer and supervision (users) + work crew (workers); daily revalidation with 4 roles | linked and finished APR, signatures, checklist; closure questions | daily work authorization |
| Inspection | responsible persons (inspector…) | responsible persons signed, checklist with no pending items | deviations from the NC items |
| Deviation | — (it is a ticket) | closes like a ticket | corrective actions (child tickets) |
APR on the web
Section titled “APR on the web”
Figure 32. APR — Preliminary Risk Analysis: search by activity, name or project; columns Date, Activity / Name, Project, Rev., Status (Open / Finished) and Actions (delete).
- 1New APR.
- 2Status column: Open (amber) / Finished (green); next to it, Rev.

Figure 33. New APR: APR template and Project (required), activity description, name (optional), revision, area owner, work location and date. Create and fill in opens the detail.
- 1APR template (required); next to it, Project.
- 2Activity description — shown in the Activity / Name column of the list.
- 3Create and fill in.

Figure 34. Detail of an open APR (APR-2026-0021), Checklist tab: header with status, revision, number, project, responsible person, location and date; the Bring risks from the inventory (PGR) button (opens “Risks of the project and of the team’s job roles” → Add to grid) and the start of the template checklist (16/16 C), in sections (ACTIVITY TYPE, IDENTIFICATION…): each item is answered according to the template — options, checkboxes or text — with a comment, Suggest / Improve text and Send photo/PDF.
- 1Document number (next to it, Rev. 0 and the Open chip).
- 2Bring risks from the inventory (PGR).
- 3First checklist item (“1) Type of activity”, ACTIVITY TYPE section).
- 4PDF report (when finished, Reopen also appears).

Figure 35. End of the checklist of APR #20 (items 14 to 16, PPE and CPE) and the Preliminary Risk Analysis section with the risk grid “Activity steps and risk analysis” (Activity / Hazards Identified / Hazard Source / Potential Harm / Safety Recommendations / Responsible) filled in with the six rows imported from the inventory. Below the grid (outside the screenshot) are “Add section”, which creates a manual row, and Finish.
- 1Hazards Identified column (group + hazard, coming from the inventory).
- 2Safety Recommendations column (controls from the inventory).

Figure 36. Signatures tab of a finished APR (APR-2026-0020 · rev. 4, Reopen and PDF report buttons): Responsible persons (role + user, signed with the registered signature), “Was there an incident?”, Team acknowledgment (4 of 4 signed) and the trail. On an open APR, Add responsible person (role/job role + user) and Add participant (list or quick registration) also appear, with Sign for each person.
- 1Role of the responsible person (SAFETY TECHNICIAN — Suporte2 ATG, Signed · 08/10/2026) — users sign only for themselves.
- 2Was there an incident? Yes / No (a flag; the record is made as in chapter 6).
- 3Team acknowledgment (4) · 4 of 4 signed — workers with a drawn signature.
- 4Signature trail: this APR was reopened three times — the signatures of rev. 1 to rev. 3 appear in red as “Invalidated — APR reopened” and the rev. 4 signatures, collected again, in green (intact).
- New APR → template, project, activity, location, date → Create and fill in.
- Checklist tab → Bring risks from the inventory (PGR) → check the relevant risks → Add to grid. Complete the grid with what is specific to the work front.
- Answer the checklist (photo where the template requires it).
- Signatures tab → Add responsible person (you and the engineer, for example) → each one Signs.
- Add participant → select the team → each one signs on screen. If someone has a pending NR/ASO/OS, the system asks for a justification to include them.
- Go back to the Checklist → Finish. If a signature or item is missing, the message lists what is missing.
- PDF report for the work front. Need to change it? Reopen (invalidates the signatures).
APR in the app
Section titled “APR in the app”


App H2OFigure 37. In the app: the list filters by All / Open / Finished and by Project; New APR (Project and Template required; Activity, Location, Name, Revision, Area owner — “Without Activity, the document name becomes the template name”) → the detail shows the document card (Open, Revision 0, project, area owner, activity, location, date, photos) with the “Checklist — 16 of 17 items” bar, the team acknowledgment inline (avatar, name, ✓ time) and the Closure card (Fill in checklist →, Sign, Finish APR, PDF report).
- 1Open filter (next to it, All and Finished); each card shows the status dot, date, project and location.
- 2Project filter (All projects).
- 3New APR button.
- 4Project of the new APR (required).
- 5Template (required): selector with the APR templates downloaded to the device; if there are none, sync before creating.
- 6Activity (below, Location, Name, Revision, Area owner).
- 7Create APR.
- 8Checklist bar of the detail with the progress (16 of 17 items).
- 9Team acknowledgment card (2 signed: avatar, name, ✓ time) with Add team member.
- 10Closure card: Fill in checklist →, Sign, Finish APR.



App H2OFigure 38. Checklist: header with “16 of 17 answered”, the C / NC / PC / NA / NP legend, General comments and Report (PDF); each item is answered with the template buttons (e.g., Routine / Non-routine / Unscheduled) and has Add a comment — on items that require a photo, Take photo or Scan document appear. Team: those who have signed show “Signed on…” and Redo signature; to add someone, Worker selector → Add team member → sign on the pad. Finish: the warning reminds you that the document does not reopen through the app or the server.
- 1Checklist Report (PDF).
- 2Add a comment on the item (here, 1. Type of activity: Routine / Non-routine / Unscheduled).
- 3Answer legend: C compliant, NC, PC, NA, NP.
- 4Worker selector, in the Add section.
- 5Add team member.
- 6Redo signature for someone who has signed (“Signed on 10/08/2026 18:00”).
- 7Finish APR warning: once finished, the document does not reopen — neither in the app nor on the server.
- 8Confirm (next to it, Cancel).
PT on the web
Section titled “PT on the web”
Figure 39. New PT: PT template, Project, Linked APR (default “— Link later —”; warning “Without a finished APR, the PT cannot be finished”), description of the work/tools, name, revision, activity location, issuing company, on behalf of the client, opening date and time. Create and fill in opens the detail.
- 1PT template (PT type); next to it, Project.
- 2Linked APR (risk analysis).
- 3Issuing company; on the left, On behalf of the client.
- 4Opening date and time.

Figure 40. Detail of the open PT (PT-2026-0015 · rev. 2, Rev. 0), Checklist tab: badge of the linked APR (green = APR finished; amber with an open APR and red with no APR), Checklist, History, Signatures and Revalidation tabs, and the checklist of the “PT — Work at Height Permit (standard template)” template (93 items, 38 C · 7 NC). The “Linked APR” bar with Save appears on the Signatures and Revalidation tabs.
- 1APR APR-2026-0020 badge — the linked APR, finished.
- 2Revalidation tab — daily renewal of the PT.
- 3PDF report (when finished, Reopen also appears).

Figure 41. Signatures tab: responsible persons in two groups — Statement of the Contractor (Issuer) and Statement of the Supervision —, the Revalidation and closure block (keep open for revalidation? work completed? area cleaned and tidied up?) and the Work crew (Add participant + each member’s signature).
- 1Statement of the Contractor (Issuer) — below, Statement of the Supervision; users with a registered signature (Add responsible person on the right).
- 2Revalidation and closure — the three Yes / No questions.
- 3Work crew (3) · 3 of 3 signed — workers with a drawn signature (Add participant on the right).

Figure 42. Revalidation tab — “Daily revalidation (1)”: New revalidation; per day (Day 1): date, start, end, “Initial conditions OK?”, the 4 fixed signatures — Client Lead, Contractor Lead, Client Occupational Safety, Contractor Occupational Safety — and the note.
- 1New revalidation (one record per working day).
- 2Initial conditions OK? Yes / No (below, the Notes field).
- 3Fourth signature role — Contractor Occupational Safety; the other three next to it, all signed.
- Finish the APR for the work front (previous section).
- New PT → template, project, linked APR, work, issuer, client, opening → Create and fill in.
- Template checklist; Signatures tab → issuer and supervision sign; Work crew added and signing.
- On each working day: Revalidation tab → New revalidation → the four signatures.
- At the end: answer work completed / area cleaned and Finish (requires a finished APR, signatures and checklist). The “keep open for revalidation” field only records the intention; it does not prevent finishing.
PT in the app
Section titled “PT in the app”


App H2OFigure 43. In the app, the PT has the Work crew (like the APR team) and the Revalidations section: each day shows “Revalidation on <date>”, time, “conditions OK / NOT compliant”, the note and the four role badges (✓ = signed) — tapping a pending role opens the signature pad. New revalidation asks for the date, start and end times, “Were the permit conditions maintained?” and notes. When you Finish PT, the app asks Service completed, Area cleaned and Keep the permit open for daily revalidation? — with “keep”, the PT stays open and “Closure saved — the permit stays open for daily revalidation” appears.
- 1Work crew card (3 signed) with Add crew member.
- 2Revalidations section: Revalidation on 10/08/2026, 07:30 – 17:00, conditions OK and the note; below, New revalidation.
- 3✓ Client rep. badge (signed); next to it, Contractor rep., Client safety and Contractor safety.
- 4Date (MM/DD/YYYY) of the new revalidation — the date follows the app language format.
- 5Start time (HH:MM); below, End time.
- 6Were the permit conditions maintained? (Yes/No; below, Notes).
- 7Confirm the revalidation (next to it, Cancel).
- 8Service completed (Yes/No), when finishing the PT.
- 9Area cleaned (Yes/No).
- 10Keep the permit open for daily revalidation? — No finishes the PT; Yes records the closure and keeps it open.
Safety inspection
Section titled “Safety inspection”
Figure 44. Finished safety inspection (INS-2026-0003 · rev. 2, inspector Emily Carter, “Field Safety Inspection (base template)” template): Reopen, Report deviation and PDF report buttons; Checklist, History and Signatures tabs; checklist with 21 items (19 C · 2 NC) — item 5 is Non-compliant, with a comment and a photo. (New Inspection, on the list, asks for template, project, name, inspector, location, date and notes.)
- 1Report deviation — opens the deviation with the source already filled in (inspection #).
- 2Inspection number and revision.
- 3Signatures tab: responsible persons (Inspector, Inspection lead…) sign; the inspection has no team acknowledgment.

Figure 45. Non-compliant item of the inspection checklist, with comment and photo — this is the item that becomes a deviation (Unsafe condition class, Critical level, in the example).
- 1NC item “7) Collective protections (guardrails, netting, catch fans) installed?” — answer No.
- 2Inspector’s comment that goes into the deviation (below, the photo).


App H2OFigure 46. In the app, the inspection has the card (Finished, project, inspector, notes, 2 photos), the Checklist bar (21 of 21 items) and the closure (no team block). In the checklist, an item marked NC gets the ⚠ Report deviation for this item button — which only appears after the inspection has been sent to the server (the source needs the inspection number). It opens the deviation screen with “Origin: inspection #X · item Y” filled in.
- 1Checklist bar (21 of 21 items).
- 2Closure card (Fill in checklist →).
- 3Inspection Report (PDF).
- 4NC non-compliant legend in the checklist header.
- 5⚠ Report deviation for this item, on item 5 (answered No, with Another photo (1) and the inspector’s comment).
Deviations and corrective actions
Section titled “Deviations and corrective actions”A deviation is a ticket of the Occupational Safety category with an extra classification: class (Unsafe act, Unsafe condition, Environmental, Quality, Housekeeping) and level (Low, Medium, High, Critical — which becomes the ticket priority). Because it is a ticket, it has the usual technician, due date, notes, photos and closing; the Deviations screen adds the SST view and the corrective actions (child tickets).

Figure 47. SST deviations: filters by class and level; columns Ticket, Title, Class, Level, Status (of the ticket) and Created. New deviation opens the modal (title, description, class, level, project, priority) and, on save, offers Open full ticket.
- 1New deviation.
- 2Class column (Unsafe act, Unsafe condition…); next to it, the colored Level.
- 3Status column — the ticket status (New).

Figure 48. Detail of deviation #51995: level (Critical), class, status, Source: inspection #3, Open full ticket and the Corrective actions (1) panel — New corrective action (title, description, owner technician) creates a child ticket (#51998); each action shows Resolved / Overdue / Open (or Cancelled).
- 1Source: inspection #3.
- 2New corrective action → child ticket with an owner.
- 3Action status (Open).


App H2OFigure 49. In the app, Report deviation (“Becomes a ticket with the classification attached”): title (required), description, class, level (“Level Low opens the ticket with priority 2”), Take photo and the Report deviation button. Without a network it stays Waiting to be sent; afterwards it appears under Reported deviations with number, level/class/status pills and the source (when it came from an inspection) — tapping it opens the ticket.
- 1Title (required); below, Description.
- 2Class (Unsafe act, Unsafe condition…).
- 3Level → becomes the ticket priority (“Level Low opens the ticket with priority 2”).
- 4Take photo.
- 5Report deviation button.
- 6Reported deviations section: #51999, #51997, #51996 (this one with “Source: inspection #3”), each with the level, class and status pills.
- 7Card of deviation #51995 “Scaffold without guardrail on the 5th floor” — tapping it opens the ticket.
Was this page helpful?